CN
News Center
News
The weekly mining and stripping output of the Cartoonba copper mine project department of Sinomine Corporation in Africa has exceeded 800,000 tons
Time:2025-11-12
Source:

On October 22 local time, in the just-ended week, the weekly output of the China Minmetals Cartoonba Copper Mine Project Department of the African company historically exceeded 800,000 tons, reaching 804,800 tons.

This output marks a fundamental shift in the project's production capacity from pursuing a "daily peak" to achieving "continuous weekly high output". It is not only an accumulation of output but also a powerful proof that the project's production stability, system reliability, and operational maturity have reached a new height, initiating a new stage of large-scale high output for the project.

This week's output has set a new record, and the core driving force lies in the full play of the efficiency of the entire production chain and the thorough removal of bottleneck links. Previously, the transportation bottleneck was effectively resolved by supplementing mining cards, laying a solid foundation for this round of high production. This week, all the links of the project, including mining, blasting, transportation and crushing, demonstrated extremely strong coordination and stability. Large excavators and drilling RIGS have maintained a high attendance rate continuously. The transportation system has demonstrated a powerful collaborative combat capability, ensuring smooth transfer and enabling the entire production system to operate efficiently in a coordinated manner. Eventually, the weekly output has been pushed to a new platform of 800,000 tons.

This systematic victory has greatly boosted the confidence and morale of all employees and provided the most solid guarantee for the successful completion or even exceeding of the annual goals.

Produced By CMS 网站群内容管理系统 publishdate:2026-02-09 15:25:11